Field wear like this was analysed on site and the lessons are built into our chain specification; material and heat treatment details stay in-house. Send the duty data and we quote the matched chain and sprocket set.
MOQ is 100 m and standard production lead time is 60 days from order and drawing confirmation, including pre-calibration and material certificates. Inquiries are answered within 24 hours.
Yes. The steel pipe gripping and carrying chain uses high side plates that seat pipes across a range of diameters and keep them stable through mill transfers. Send the pipe diameter range and conveyor layout, and we match pitch and plate height.
Attachments are made to the drawing: bent and welded flights, F-series pads, spaced layouts such as an attachment every 4 links on the P62.5, or two attachments per pitch on the P260 for scraper duty. K2 and G4 platforms are also built to order.
Yes. The ST9000-C14 segmental split sprocket lets tooth segments be replaced in place without dismantling the shaft, shortening shutdowns. Matching sprockets are made with the chain, so tooth form, bore and keyway follow the actual chain pitch.
Large pitch builds include the 1209A for heavy billet and slab transfer, the SHP300 and SHP400 for high load conveying, and the P150-HT4 for high temperature service. Pitch, attachment and breaking load are published per size - send the drawing.
Heavily loaded steel mill positions use quenched and tempered 40Cr, 40Mn or 42CrMo plates with case carburized or induction hardened pins, bushes and rollers; forged parts use 16MnCr5 and 20CrMnTi. High-temperature zones are reviewed case by case.
Yes. We build to interchange: send the OEM part number, an old link or a dimensioned drawing. We check pitch, attachment spacing and sprocket form before manufacture, and supply the matching sprocket as one set. No competitor brand name is needed.
For run-out, cross transfer and cooling bed feed we review the P200-At-E2L large pitch chain and the P80 3150H with one-piece heightened outer plates that carry bar and billet loads clear of the link plates. Send the layout and duty data.