Field breakages like this were analysed on site and the lessons are built into our chain specification; material and heat treatment details stay in-house. Send the duty data and we quote the matched chain and sprocket set.
MOQ is 100 m and standard production lead time is 60 days from order and drawing confirmation, including pre-calibration and material certificates. Inquiries are answered within 24 hours.
Yes. Round link mining chain runs from 14x50 to 30x108 in Grade B and Grade C, with proof and breaking loads published per size. The matching connection rings are selected with the chain so the connection strength matches the grade.
For coal handling we review the M630A250 engineering class chain - a DIN 8167 / ISO 1977 M-series build for scraper conveyors on long-wall faces, preparation plants, transfer stations and inclined runs - and the P200-K2-E2P apron feeder chain.
Yes. Matching sprockets are made with the chain, so tooth form, bore and keyway follow the actual chain pitch. Segmental and split sprockets let tooth segments be replaced in place without dismantling the shaft, shortening a planned shutdown.
For elevators we review the 4037-G6 with G6 attachments that fix the buckets between the strands, or the ER series for bushed bucket elevator builds. Both are pre-calibrated before ex-works. Send the elevator layout.
Heavily loaded positions use quenched and tempered 40Cr, 40Mn, 42CrMo or 40CrNiMo plates with case carburized or induction hardened pins, bushes and rollers; forged parts use 16MnCr5 and 20CrMnTi. Wet circuits are reviewed for stainless builds.
Yes. We build to interchange: send the OEM part number, an old link or a dimensioned drawing. We check pitch, attachment spacing and sprocket form before manufacture, and supply the matching sprocket as one set. No competitor brand name is needed.
For bridge and portal reclaimers we review the P315 reclaimer chain with A2 attachments first: A2 bent plates give a bridge reclaimer flight a bolted platform. Send the machine drawing or an old link and we confirm pitch and A2 spacing.