Parallel chain strands with paired attachments cradle steel pipes for horizontal transfer.
This is a chain that grips and carries steel pipes. Its duty is product transfer rather than bulk material removal. A number of chain strands run side by side in parallel, and on each strand two opposing attachments form a groove or cradle. The steel pipe rests in that cradle and is carried horizontally along the line, supported at several points by the parallel strands. The cradle holds the pipe in position and keeps it from rolling while it is transferred. Attachment form, the spacing between the strands and the chain pitch are built to the line layout and the customer drawing.
Horizontal transfer of steel pipes between rolling and finishing stations
Parallel-strand pipe cooling and holding tables
Pipe alignment and spacing on inspection and transfer lines
Replacement chains for installed multi-strand pipe conveyors
Two opposing attachments form a groove; the steel pipe sits in the groove and is located without rolling, while the surface of the pipe is protected.
Several chain strands run side by side so a long pipe is supported at several points along its length and stays aligned during transfer.
The strands carry the pipe horizontally along the line, and the cradle rather than the chain pitch alone sets the pipe position.
Attachment form, strand spacing, centre distance and chain pitch are confirmed from the customer drawing or an old link before manufacture.
Pins, bushes and plates are specified by grade and heat-treatment method after the load and working temperature are known; no hardness value is used to specify the build.
This page publishes no dimension table. Outline and fitting dimensions are confirmed from the customer drawing or an old link before manufacture; no dimensional or strength value is quoted without an approved catalogue or on-site source.
All dimensions and strength values on this page are reproduced cell for cell from the approved SHINING catalogue or the approved on-site table. No value has been converted, interpreted or added. Internal structure dimensions, tolerances and process parameters are not published. Outline and fitting dimensions are confirmed from the customer drawing or an old link before manufacture.
Pipe position is set by the cradle and the strand spacing rather than by the chain alone, so we confirm the attachment pair from the line layout first. SHINING has manufactured conveyor chain for more than twenty years in a 36,000 m2 production base in Changzhou, Jiangsu, with in-house cutting, machining, welding, heat treatment and testing. Chains are produced under ISO 9001:2015 and ISO 14001:2015 certified systems, with material certificates and certificates of conformance issued with every order. Standard production lead time is 60 days and MOQ is 100 m.
Send the working position, centre distance, attachment drawing or an old link and our engineers will confirm the chain build, the attachment spacing and the matching sprocket before manufacture. Twin strands are length-matched before dispatch, and inquiries are answered within 24 hours. Write to sales@shiningco.com for a drawing review.
Write to sales@shiningco.com with the working position, centre distance, attachment drawing or an old link. Inquiries are answered within 24 hours.